Oshawa Interlocking Contractor · Reformity Inc.Interlocking Driveways & Patios in Oshawa

In Oshawa a driveway can cover at most half of the front yard, and a wider curb cut needs an Access to Property Permit. North-end subdivisions like Windfields and Kedron are where we do most driveway upgrades from asphalt to interlock.

Free Estimate

Get a Oshawa interlocking quote.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287

Interlocking · real projects

Recent interlocking jobs across the GTA.

Real Reformity jobs from our project files. Customer addresses are never published.

Interlock driveway site plan — Site plan with curb cut, paver base section and notes. Illustrative sample sheet. Click to enlarge.

Concrete driveway plan

Permits in Oshawa

We prepare and submit your permit drawings.

A site plan with dimensions to the lot lines and curb, the paver pattern and borders, slopes, and the base section. Changing a curb cut needs a municipal permit, and this is the plan the application asks for.

Interlocking permits in Oshawa

In Oshawa a new or wider curb cut needs an Access to Property Permit, any grade change within 0.6 m of the property line needs a Site Alteration Permit, and the City's grading page lists driveway widening, moving and re-routing for that permit too. Reformity draws a site plan that keeps the driveway within half the front yard and handles the applications.

  • Dimensions to your lot lines
  • Materials, sizes and spacing
  • Footing and base sections
  • Code notes for the inspector
How our drawings work

City of Oshawa rules

Interlocking rules in Oshawa.

Checked against official municipal and provincial sources. Lots differ, so we confirm the rules for your address at the quote visit.

  • Driveway widening

    A new or wider curb cut needs an Access to Property Permit (curb cut requests are reviewed April 1 to November 30), the driveway can't cover more than 50% of the front yard, and changing the grade within 0.6 m of the property line needs a Site Alteration Permit.

    City of Oshawa: driveways & curbs
  • Conservation areas

    Work in Central Lake Ontario Conservation Authority (CLOCA) regulated areas, such as flood plains and land near creeks, can need a CLOCA permit, and the City won't issue a Site Alteration Permit there until it has a copy.

    City of Oshawa: landscaping & grading
  • Heritage districts

    Oshawa's only Heritage Conservation District is in the South Field at Oshawa Executive Airport. Over 40 properties are designated under the Ontario Heritage Act; altering a designated property needs a Heritage Permit (no fee), and Council has 60 days to decide on demolishing a listed, non-designated one.

    City of Oshawa: heritage properties
  • Front-yard paving

    Zoning By-law 60-94's general rule keeps at least 50% of a residential front yard, and of an exterior side yard, as landscaped open space. Walkways and patios count toward it; driveways and parking spaces don't. Going lower takes a Committee of Adjustment variance, and cars must park on your lot, not the boulevard.

    Oshawa Zoning By-law 60-94 (PDF)
Concept renderConcept render: Charcoal and grey interlock driveway with contrasting border at a 1990s brick two-storey with double garage in Oshawa
Concept render of a typical Oshawa interlocking project, not a photo of a completed job. Real jobs are in the photos above.

What we build in Oshawa

Interlocking driveways & walkways.

  • Concrete Pavers
  • Natural Stone
  • Permeable Interlock
  • Edge Restraints & Sand
Full interlocking details, materials & process

Neighbourhoods

Interlocking across Oshawa.

  • Samac
  • Taunton
  • Windfields
  • Kedron
  • Eastdale
  • Donevan
  • Lakeview
  • Centennial
  • McLaughlin
  • Northglen
  • O'Neill
  • Vanier

Oshawa Interlocking FAQ

Quick answers.

Only if the City can fit it in. Oshawa reviews curb cut requests between April 1 and November 30, needs at least 10 business days and a site visit for each one, and doesn't inspect or cut curbs from December 1 to March 31. A request sent late in the season can be held until spring, so plan the curb work around that.

A new or wider curb cut needs an Access to Property Permit (curb cut requests are reviewed April 1 to November 30), the driveway can't cover more than 50% of the front yard, and changing the grade within 0.6 m of the property line needs a Site Alteration Permit.

Zoning By-law 60-94's general rule keeps at least 50% of a residential front yard, and of an exterior side yard, as landscaped open space. Walkways and patios count toward it; driveways and parking spaces don't. Going lower takes a Committee of Adjustment variance, and cars must park on your lot, not the boulevard.

Send the form on this page or call 437-241-6287. We reply within one business day, visit your Oshawa property to measure and check the City of Oshawa rules for your lot, and give you a fixed written price.

Free on-site quote

Planning interlocking in Oshawa?

We'll measure, check the City of Oshawa rules for your lot, draw it up and give you a fixed written price. One business-day reply.

Free Estimate

Book my Oshawa site visit.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287