Decking project by Reformity Inc.

Custom Deck Builders · Toronto & the GTACustom decks for outdoor living.

Composite and pressure-treated decks designed and built to last 25+ Canadian seasons.

Free Estimate

Get your decking quote.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287

Why Reformity

Why decking with Reformity.

Whether it's a low-profile lounge deck or a multi-level entertainer's platform with built-in seating, we design and build to the way you actually live outside.

  • Engineered concrete footings

    Below frost line, sized to deck load — no bouncy decks.

  • Code-compliant railings

    Heights, baluster spacing, stair geometry all hit Ontario Building Code.

  • Hidden fasteners

    On composite builds — no screw heads in your sightline.

  • Permit handling included

    We pull and manage the building permit when required.

Materials & Styles

What we work with.

Grey capped-composite deck boards with a black aluminum railing, sunlit, beside a new wood privacy fence.

Composite

Trex, TimberTech, Fiberon — minimal maintenance, 25-year warranties.

Newly built pressure-treated pine deck with a matching square-baluster wood railing and solid privacy wall in a fenced backyard.

Pressure-Treated Pine

The classic budget build — 15–20 year life with care.

Warm reddish-brown natural wood deck boards with visible knots and grain, wood privacy screen, evening light.

Cedar

Natural beauty, hand-feel that no composite can match.

Frameless glass railing on polished stainless spigots edging a raised deck, carried down wide cascading stairs with black riser lights.

Railings & Rails

Aluminum, glass panels, cable rail — pick the look that fits your home.

Our Process

From quote to clean-up.

  1. 01

    Design Visit

    Sketch the layout, talk materials, talk railings.

  2. 02

    Permit + Quote

    We pull the permit (if needed) and lock in a fixed price.

  3. 03

    Footings & Frame

    Concrete sonotubes, ledger flashing, joists.

  4. 04

    Decking & Rails

    Boards down, rails up, final inspection.

Deck drawing — framing plan — Framing plan, section through the deck and elevation. Illustrative sample sheet. Click to enlarge.

Deck drawing — elevations & details

Permit drawings included

We prepare and submit your permit drawings.

Every deck starts with a framing plan, footing layout, and guard and stair details sized for your yard. When your city requires a permit, the drawing set goes in with the application and the inspector checks the build against it.

  • Dimensions to your lot lines
  • Materials, sizes and spacing
  • Footing and base sections
  • Code notes for the inspector
How our drawings work

Recent Decking Work

A few we're proud of.

View Full Gallery

Frequently Asked Questions

Quick answers.

In most GTA municipalities a permit is required for decks over 24" off the ground, attached to the house, or with structural railings. We assess and pull the permit on your behalf when needed.

Composite costs roughly 1.5–2x more up front but eliminates staining/sealing labour. Over 15 years, composite usually wins on total cost. For homes you plan to sell soon, pressure-treated can make sense.

Yes — including pool-code self-latching gates and slip-resistant surfaces. Inground pools usually require engineered footings to keep loads off the pool wall.

Railings required at any deck surface > 24" above grade (typically 36"–42" guard height). Stair rises 5–7", treads 10" min. We build to the current Ontario Building Code on every job.

Yes. We do covered decks, louvered pergolas, integrated lighting, and built-in benches. Tell us how you want to use the space.

Yes. We install aluminum, glass panel and cable railings, on new decks or to replace an aging railing. Guards are required on any deck surface more than 24 inches above grade, and we build heights, baluster spacing and stairs to the Ontario Building Code so the railing passes inspection.

In the GTA, plan on every 1–2 years for pressure-treated pine and every 2–3 years for cedar, more often on south- and west-facing decks. Capped composite needs no staining, just an occasional wash. New pressure-treated lumber should dry for 60–90 days before its first coat.

Yes. We remove the old deck and build the new one like any of our decks: engineered concrete footings below the frost line, and railings and stairs built to the Ontario Building Code. Replacement decks generally fall under the same permit rules as new ones, and we pull the permit when one is needed.

Real Homeowners

See what homeowners say.

"Shaheen and his crew were fantastic. Fair pricing allowed us to do more within our budget than what we had originally planned. Constant communication, professional, and the crew did a fantastic job in such a quick time frame. Highly recommend."

Verified Homeowner

via Homestars

"Shaheen did an amazing job on my fence. The team was professional, on time, and completed the work quickly with great attention to detail. The fence looks fantastic, and I'm really happy with the quality. Highly recommend them!"

Verified Homeowner

via Homestars

Verified
"We had a great experience with Reformity. Omar and Shaheen were excellent throughout the process, providing clear communication and making everything easy from start to finish. Adam and Johnny did a fantastic job with the installation. We're very happy with our new fence and would highly recommend Reformity Inc!"

Maria Seher

via Bark

Ready to Build?

Free decking quote in under 24 hours.