Every fence, deck and interlock project we build starts as a custom, dimensioned drawing. You see exactly what you're getting before we dig, and when your city needs a permit, the drawings and the application are handled for you.

Fences · Pool enclosures · Decks · Interlock & driveways · Retaining walls · Basements

Free Estimate

Get a drawing & quote.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287

Concept renderIllustration: printed deck framing drawings with a tape measure and pencil on a work table, with a new deck frame being built behind.

Why we draw first

The drawing is the plan.

  • Approved before we dig

    You sign off on the exact layout, heights, materials and gates on paper, so nothing on site is a surprise.

  • Permit paperwork handled

    Pool enclosures, raised decks, curb cuts, tall retaining walls and finished basements often need a permit. We prepare the drawing set and handle the application.

  • Built to the drawing

    Our crews build from the same sheet that was approved, so what goes in the ground matches what you and the city signed off on.

  • A quote you can check

    Quantities come straight off the drawing, so your fixed price lines up with the real material list.

Sample drawings

What you get on paper.

Illustrative sample sheets (AI-generated, marked “Sample – not for construction”) showing what each drawing covers. Yours is drawn for your property, your materials and your city's rules. Click any sheet to enlarge it.

  • Fence permit drawing

    Elevation, post-footing section and key plan

  • Pool enclosure permit drawing

    Enclosure site plan, gate elevation and notes

  • Deck drawing — framing plan

    Framing plan, section through the deck and elevation

  • Deck drawing — elevations & details

    Rear elevation, stair and guard details

  • Interlock driveway site plan

    Site plan with curb cut, paver base section and notes

  • Concrete driveway plan

    Control-joint layout, slopes and slab section

  • Landscape & grading plan

    Grading, drainage swale, tree protection and planting

  • Retaining wall details

    Wall section, drainage and elevation

  • Basement finish floor plan

    Rooms, egress window, alarms and wall section

When a permit comes in

What usually needs one.

Rules are set city by city, so treat this as a guide. Each city page lists that city's own rules with links to the official source, and we confirm them for your address at the quote visit.

  • Fences & pool enclosures

    A standard backyard fence usually needs no permit, but every city caps fence height by yard (roughly 1.8–2.5 m at the back and 0.9–1.2 m for a solid front-yard fence). Every city on this site requires a permit or city approval for a pool enclosure before the pool goes in.

    Example: Toronto Municipal Code Ch. 447
  • Decks

    Toronto, Mississauga and Brampton require a permit once a deck is about 60 cm (2 ft) above the ground, and Brampton for any deck attached to the house. Markham and Richmond Hill also count attached decks and decks over 10 m² (108 sq ft). Low freestanding platforms are often exempt but still have to meet zoning.

    Example: City of Toronto permit guide
  • Driveways, interlock & concrete

    Re-paving inside your existing driveway usually needs no building permit. A new or wider curb cut needs a municipal permit, and most cities limit driveway width by lot frontage or by how much of the front yard can be paved.

    Example: City of Mississauga permit guide
  • Retaining walls

    Under Ontario's Building Code, a retaining wall with more than 1 m (3'3") of exposed height next to public property, a building's access, or private property open to the public needs a building permit and a structural design.

    Ontario Building Code, Div. A 1.3.3.5
  • Basements & second units

    Toronto requires a permit to finish a basement if you add or remove walls, change plumbing or heating, underpin, add an entrance or create a second unit; Mississauga for any finish that creates rooms or living space. Ontario allows up to three units on most urban residential lots, and each new unit needs a building permit.

    Ontario: additional residential units
  • Grading, trees & ravines

    Regrading, bringing in fill, or working near a protected tree, a ravine or a creek valley can need a site-alteration permit, a tree permit or conservation-authority approval, depending on the city and the lot. We check the maps for your address before designing.

How it works

From site visit to inspection.

  1. 01

    Site visit

    We measure your property, mark lot lines, trees and slopes, and talk through what you want.

  2. 02

    Drawing

    We draft the plan, elevations and details for your exact project and city.

  3. 03

    Your review

    You check it, we revise it, and the fixed quote is built from the final sheet.

  4. 04

    Permit

    If your city needs one, the application goes in with the drawings. We keep you posted.

  5. 05

    Build

    We build to the approved drawing and walk the finished job with you.

FAQ

Drawings & permits, answered.

Usually not for a standard backyard fence, but your city's fence by-law sets the maximum height in each part of the yard. A pool enclosure needs a permit or city approval in every city we serve. We draw the fence either way, so you can approve the exact layout before we dig.

Usually once the deck is about 60 cm (2 ft) or more above the ground, and in Brampton, Markham and Richmond Hill whenever it's attached to the house. Low freestanding platforms are often exempt but still have to meet zoning setbacks. Each city page lists that city's rule with a link to the official source.

We do. We prepare the drawings for your project, handle the application with your city's building department and build to the approved drawings.

No. They're illustrative sample sheets (AI-generated, marked “Sample – not for construction”) showing what each type of drawing covers. Your drawing is made for your property, your materials and your city's rules.

Ontario's Building Code requires drawings submitted for a building permit (a raised deck or a finished basement, for example) to come from a BCIN-qualified designer, an architect or an engineer, and retaining walls over 1 m beside public property need a structural design. Where that applies, the qualified sign-off is part of the drawing set. Fence, pool-enclosure and driveway site plans fall under city by-laws instead.

Your address and a time for the free site visit. If you have a copy of your property survey, keep it handy: it shows the lot lines the drawing measures from.

Yes. Fences, decks and interlock all start with a drawing. It's how you approve the layout before we start and how we price the job from real quantities.

Start with a free site visit.

Tell us what you're planning. We'll measure, check your city's rules for your lot and come back with a drawing and a fixed price.