Richmond Hill Concrete Contractor · Reformity Inc.Concrete & Asphalt Driveways in Richmond Hill

If you're adding a basement unit in Richmond Hill, the walkway is part of the zoning. By-law 93-25 requires an access path at least 1 m wide from the street or lane to the unit's entrance, with a hard surface at least 0.75 m wide along its whole length, and the driveway, concrete or asphalt, can form part of it. On narrow subdivision side yards that usually means a poured concrete walk tied into a below-grade entrance, pitched away from the foundation so water doesn't follow it down.

Free Estimate

Get a Richmond Hill concrete & asphalt quote.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287

Concrete & Asphalt · real projects

Recent concrete & asphalt jobs across the GTA.

Real Reformity jobs from our project files. Customer addresses are never published.

Concrete driveway plan — Control-joint layout, slopes and slab section. Click to enlarge.

Interlock driveway site plan

Drawn before we build

Drawn before we build in Richmond Hill.

A plan showing slab thickness, control-joint layout, slopes away from the house and the curb details. If the curb cut changes, the same plan goes with the city's access permit application.

Concrete & Asphalt permits in Richmond Hill

A basement walkout in Richmond Hill goes through a building permit with stair, guard, drain and any underpinning or retaining-wall details, and a wider driveway needs a City curb cut application; Reformity prepares the drawings, coordinates any engineering the structure needs, and handles both applications.

  • Dimensions to your lot lines
  • Materials, sizes and spacing
  • Footing and base sections
  • Code notes for the inspector
How our drawings work

City of Richmond Hill rules

Concrete & Asphalt rules in Richmond Hill.

Checked against official municipal and provincial sources. Lots differ, so we confirm the rules for your address at the quote visit.

  • Driveway widening

    Widening needs a curb cut application, and only the City or its authorized contractors may cut the curb.

    City of Richmond Hill: curb cuts
  • Site alteration & grading

    Site Alteration By-law 47-25: adding fill, removing topsoil or changing grades needs a City permit, and a fill, excavation or landscaping application needs a grading plan by a professional engineer or Ontario Land Surveyor. Landscaping the City deems minor is exempt only if it stays 0.6 m from every property line and doesn't change neighbours' drainage.

    City of Richmond Hill: site alteration permits
  • Heritage districts

    Gormley is the City's first heritage conservation district (since 2009); every structure inside it is designated. Most exterior changes, new structures and demolition there need a heritage permit before work starts. Designated houses elsewhere need one when work affects their reasons for designation.

    City of Richmond Hill: cultural heritage planning
  • Front-yard paving

    Across most of Richmond Hill, Zoning By-law 93-25 requires at least 45% of a house's front yard (and a corner lot's street-side yard) to be soft landscaping. Interlock and permeable pavers don't count, and you can't park there.

    Zoning By-law 93-25, s.3.6 (PDF)
Concept renderConcept render: Broom-finished concrete side walkway to a below-grade basement entrance with retaining walls at a Richmond Hill home
Concept render of a typical Richmond Hill concrete & asphalt project, not a photo of a completed job. Real jobs are in the photos above.

What we build in Richmond Hill

Concrete & asphalt, done right.

  • Broom-Finish Concrete
  • Stamped / Decorative
  • Exposed Aggregate
  • Asphalt Paving
Full concrete & asphalt details, materials & process

Neighbourhoods

Concrete & Asphalt across Richmond Hill.

  • Oak Ridges
  • Bayview Hill
  • Mill Pond
  • Jefferson
  • Westbrook
  • Elgin Mills
  • Langstaff
  • Richvale
  • Rouge Woods
  • Observatory

Richmond Hill Concrete & Asphalt FAQ

Quick answers.

Yes. A basement walkout goes through a building permit with drawings of the stairs, landings, guards, drain and any underpinning or retaining walls, and the City requires a floor drain connected to the storm sewer or a sump pit. We prepare the drawings, bring in an engineer where the structural work needs one, and build the entrance.

Widening needs a curb cut application, and only the City or its authorized contractors may cut the curb.

Across most of Richmond Hill, Zoning By-law 93-25 requires at least 45% of a house's front yard (and a corner lot's street-side yard) to be soft landscaping. Interlock and permeable pavers don't count, and you can't park there.

Send the form on this page or call 437-241-6287. We reply within one business day, visit your Richmond Hill property to measure and check the City of Richmond Hill rules for your lot, and give you a fixed written price.

Free on-site quote

Planning concrete & asphalt in Richmond Hill?

We'll measure, check the City of Richmond Hill rules for your lot, draw it up and give you a fixed written price. One business-day reply.

Free Estimate

Book my Richmond Hill site visit.

Takes about 30 seconds. We reply within one business day.

Timeline

No obligation. We never share your details.

Prefer to talk? Call 437-241-6287